More compute.
Same grid connection.

Compare two saved site studies through their electrical connections and operating results.

Add 1 MW of compute.
Keep the same 5 MW connection.

The study replays 90 days of existing demand behind a 5 MW grid connection. Battery support and flexible compute coordinate around changing headroom to serve a new 1 MW AI load.

Loading saved analysis…